Tru-cut, Inc.
Arc Flash Hazard Analysis

Brief Description: TruCut supplies HVAC OEMs with out-of-production heat exchangers to support their installed base of furnaces. Each part is made according to the OEM’s prints and are approved by the OEM. The facilities for TruCut total more than 240,000 square feet in Sebring and Salem. Jaminet Engineering provide TruCut with a single line diagram of the existing facility’s electrical distribution system. We also provided short circuit calculations, an over current protective device coordination study, and an arc flash hazard analysis per the requirements of NFPA 70E and OSHA Standard 29.

Services: Infrared thermographic imaging analysis, arc flash analysis, short circuit calculations, over current protective device coordination study

Year Completed: 2014

Project Size: Sebring Facility, Salem Facility, Salem Warehouse

Project Cost: $50,000

Client Industry: Manufacturing

Delivery Method: Design-Bid